CONSTRUCTION CRITERIA
Exceeds 2018 IRC Building Codes for Shear Strength (including hurricane zones)
Utilizes Existing Home Plans & Subcontractors
Eliminates the Need For House Wrap (materials and labor)
Greatly Reduced Material Weight For Handling
Reduces Construction Labor Costs
Typically Reduces On-Site Construction Building Time By 1 to 3 Days
Stable Pricing & Availability (no allocations) of Material
Greatly Reduced Cost of Material
Affordable Structural Material When Used With ISO
Material Also Comes in 48 3/4” Wide for Overlap Installation
Material Comes Standard 8’, 9’,10’ & Available Custom Lengths Up to 12’
Sheathing Material Can Be Private Labeled
Increased Moisture Resistants
Increased Mold Resistance
Superior Moisture Barrier
Superior Vapor Barrier
PE-stamped in all 50 states and Canada*
Covered by warranty